Snug Harbor

Client: City of Panama City Contract #: PC22.009 Contract Amount: $4,131,857.00 Work consisted of constructing 500 linear feet of seawall with composite sheet piles and concrete cap, precast and cast-in-place concrete boat ramp, 300′ of floating dock and timber pier system, 110,000 sf of stabilizing parking lot with 4,200 tons of crushed concrete base and…

Read article
CALCASIEU EAST JETTY AID TO NAVIGATION STRUCTURE REPLACEMENT

Client: U.S. Coast Guard Civil Engineering Unit – Miami Contract #: HSCG82-17-J-PMV252 Contract Amount: $747,831 Work included In-House Design, Fabrication, and Installation of a three pipe pile navigation structure. The structure had three 175′ long driven pipe piles and one 90′ sacrificial pipe pile, all 24″ diameter. The navigational structure includes 65,000 lbs of fabricated…

Read article
MULLET KEY CHANNEL RANGE FRONT LIGHT EMERGENCY REPLACEMENT

Client: United Tugs c/o U. S. Coast Guard Civil Engineering Unit – Miami Contract #: 10902414 Contract Amount: $435,000 Project required underwater demolition of the existing range structure. In-house design, fabrication, and installation of a new range light structure meeting optical navigational height as required for the existing range system. Installation of structure included driving…

Read article
underwater test pool equipment | Inland Construction & Engineering, Inc. Panama City, Florida providing construction, general contracting, marine construction, design & engineering, diving services, roofing, & bulding rehab.
DESIGN BUILD UNDERWATER MULTISENSOR TEST POOL RENOVATIONS

Client: NAVFAC Southeast Dept. of Public Works G. M. Hill Engineering Contract #: N69450-17-C-8817 Contract Amount: $3,060,988 Work included installation of 90,000 SF of 60 mil HDPE liner, De-Chlorination and Dewatering of 9,000,000 gallons of water. Dredging 2,600 CY of submerged sand from the bottom of the existing pool. Re-installation of 1,500 CY of new…

Read article
Marine construction project in progress , pole being installed in water with equipment in tow | Inland Construction & Engineering, Inc. Panama City, Florida providing construction, general contracting, marine construction, design & engineering, diving services, roofing, & bulding rehab.
REBUILD ST. JOSPEH BAY ENTRANCE A RFL AND ENTRANCE C RRL

Client: U. S. Coast Guard Civil Engineering Unit – Miami Contract #: 70Z08219DPMV11600 Contract Amount: $1,686,412 Project required the demolition of the existing 54″ dia. concrete monopile and 42″ dia. steel monopile structures. Design, fabricate, and install two new range light structures meeting optical navigational height as required for the existing range system. Installation of…

Read article
Contracting prject completed - Sudduth Park | Inland Construction & Engineering, Inc. Panama City, Florida providing construction, general contracting, marine construction, design & engineering, diving services, roofing, & bulding rehab.
SUDDUTH PARK SITE WORK IMPROVEMENTS

Client: City of Panama City Contract #: PC21-034 Contract Amount: $1,331,065 Work included selective demolition and earthwork grading, storm sewer and field drainage systems, underground utilities, cast-in-place concrete sidewalks, gravity retaining wall, curbs, and parking areas, ball-field fencing and screens, pavilion with picnic tables, park benches and trash receptacles, and ball-field clay with mound and…

Read article
FEMA EMERGENCY BERM (DUNE) PROJECT

Client: Gulf County Board of County Commissioners Contract #: 2021-13 Contract Amount: $9,906,186.50 Indian Peninsula Segment Work consisted of constructing 20,457 linear feet of shoreline berm which incorporated a volume of 124,580 cubic yards of sand and 589,000 native dune plantings. Beacon Hill Segment Work consisted of constructing 14,520 linear feet of shoreline berm which…

Read article
HURRICANE IAN EROSION RESTORATION

Client: Keys Energy Services Contract #: C23-0002 Contract Amount: $535,010.00 Repair 930′ of rip rap seawall and construct 700′ of concrete curb to include demolition of existing existing concrete barrier, filling and compacting FDOT road base, reclaiming rip rap boulders and reinstalling along waterside of seawall, forming and pouring new concrete curb along fence line.…

Read article