Client: U. S. Coast Guard
Civil Engineering Unit
– Miami
Contract #: 70Z08219DPMV11600
Contract Amount: $1,686,412
Project required the demolition of the existing 54″ dia. concrete monopile and 42″ dia. steel monopile structures. Design, fabricate, and install two new range light structures meeting optical navigational height as required for the existing range system. Installation of structures included driving 100′ long 12.75″ steel pipe piles, 90′ long 18″ steel pipe piles, 15′ tall modular towers, optics platforms, solar power stands, and range boards.