Marine construction project completed, new pier installation | Inland Construction & Engineering, Inc. Panama City, Florida providing construction, general contracting, marine construction, design & engineering, diving services, roofing, & bulding rehab.
PIERS 501, 502, AND 503

Client: NAVFAC Southeast Dept. of Public Works G. M. Hill Engineering Contract #: N69450-18-C-8815 Contract Amount: $580,628 Work included modification, repair, and replacement of the existing USN Dive School Piers. Pier 501 was extended an additional 36 feet increasing the structure to 268 SF. Pier 502 was completely removed and replaced. New pier was 67-feet…

Read article
Marine construction project in progress , shipping channel lights being installed | Inland Construction & Engineering, Inc. Panama City, Florida providing construction, general contracting, marine construction, design & engineering, diving services, roofing, & bulding rehab.
DESIGN BUILD SHIPPING CHANNEL RANGE LIGHTS

Client: U.S. Coast Guard CEU Miami Contract #: HSCG82-10-D-PMVA36 Contract Amount: $786,868 Project required demolition and replacement of existing Aids to Navigation (ATON) structures. Engineering Design, In-House Fabrication, and installation of two new ATON structures at Matagorda Ship Channel and Colorado River West Jetty entrance. Driven pipe piles, cast-inplace concrete, metal fabrication, and coatings. Solar…

Read article
Marine Construction project in progress - new acoustic pier | Inland Construction & Engineering, Inc. Panama City, Florida providing construction, general contracting, marine construction, design & engineering, diving services, roofing, & bulding rehab.
DESIGN BUILD ACOUSTIC TEST FACILITY PIER

Client: U.S. Navy NAVFAC SE ACT, Inc. Contract #: N69450-13-C-6084 Contract Amount: $1,161,500 Project included demolition of existing metal building, concrete pier and pilings. Dredging for new pier construction, drive in place 12 pre-stressed concrete pilings (18″x 60′), install prestressed concrete beams, deck panels and pour in place” pier covering. Erect new pre-engineered metal building,…

Read article
Marine Construction project completed under a bridge | Inland Construction & Engineering, Inc. Panama City, Florida providing construction, general contracting, marine construction, design & engineering, diving services, roofing, & bulding rehab.
BRIDGE REPAIRS AND REHABILITATION

Client: Florida Department of Transportation District 1 Contract #: E1047 Contract Amount: $2,080,080 Project included installation of cathodic protection pile jacket systems, epoxy crack injection repairs, cast-inplace concrete, rip rap installation. Repair and replace existing timber fender systems and pilings, pile cap demolition and repairs.  

Read article
Marine Construction project in progress - warf & waterfront structure repairs in Bay County, Florida | Inland Construction & Engineering, Inc. Panama City, Florida providing construction, general contracting, marine construction, design & engineering, diving services, roofing, & bulding rehab.
REPAIR WATERFRONT STRUCTURES

Client: U. S. Coast Guard CEU Cleveland G. M. Hill Engineering Contract #: HSCG83-17-C-PCR002 Contract Amount: $2,158,393 Project included demolition and replacement of 885′ of pile cap, 200′ of sheet pile concrete wall facing, blasting and coating of 8,000 SF of in place sheet piles, replacement of 5 wood camels with HDPE Camels. Blast, coat…

Read article
Marine construction project completed, new pier installation near a US Coast Guard Ship | Inland Construction & Engineering, Inc. Panama City, Florida providing construction, general contracting, marine construction, design & engineering, diving services, roofing, & bulding rehab.
NORTH AND SOUTH PIER REPAIRS

Client: U. S. Coast Guard CEU Cleveland G. M. Hill Engineering Contract #: HSCG83-17-C-PCR003 Contract Amount: $2,148,794 Project included the repairs of two 40′ wide by 680′ US Navy style piers. Cathodic protected spall repairs in excess of 3,500 SF. 90 Cathodic Protection Pile Jackets and 25 Camel Repairs  

Read article
Marine Construction project completed under a bridge for repairs to cement pillars | Inland Construction & Engineering, Inc. Panama City, Florida providing construction, general contracting, marine construction, design & engineering, diving services, roofing, & bulding rehab.
BRIDGE REPAIRS AND REHABILITATION

Client: Florida Department of Transportation District 1 Contract #: E1P56 Contract Amount: $1,109,997 Project included spall repairs, pile cap replacement and repairs, cathodic protection pile jackets, crack injection repairs, fabrication and installation of a new steel ladder access system, and application of 16,200 SF of two-part epoxy and aggregate overlay system on bridge deck.  

Read article
Marine Construction project in progress - new wood dock installation in Bay County | Inland Construction & Engineering, Inc. Panama City, Florida providing construction, general contracting, marine construction, design & engineering, diving services, roofing, & bulding rehab.
BAY COUNTY BOAT RAMPS POST HURRICANE MICHAEL STORM REPAIRS

Client: Bay County Board of County Commissioners Contract #: 19-144 Contract Amount: $321,456 Work included Design, Fabrication, and Installation of a three pipe pile navigation structure. The structure had three 175′ long driven pipe piles and one 90′ sacrificial pipe pile, all 24″ diameter. The navigational structure includes 65,000 lbs of fabricated steel with galvanized…

Read article
LCU RAMP REPAIRS

Client: U.S. Army Corps of Engineer Wilmington District Contract #: W912PM-17-C-0022 Contract Amount: $1,035,178 Project included installation of concrete floating docks, precast concrete pilings, steel sheet pile breakwater, rip rap stone shoreline protection, rebuilding of existing timber docks. Installation of temporary cofferdam and dewatering system, demolition of existing articulated concrete ramp, and installation of new…

Read article
Marine Construction project in progress - warf repairs in Bay County, Florida | Inland Construction & Engineering, Inc. Panama City, Florida providing construction, general contracting, marine construction, design & engineering, diving services, roofing, & bulding rehab.
WHARF REPAIRS

Client: U.S. Army Corps of Engineers Wilmington District Contract #: W912PM-17-C-0013 Contract Amount: $2,762,232 Project included 2,000 LF of epoxy injection crack repairs along eight (8) center wharf concrete beams, replacement of the South Wharf fender system, replacement of the North Wharf fender piles and wales. Install two new concrete piles and incorporated deck tie-in…

Read article