Client: NAVFAC Southeast
Dept. of Public Works
G. M. Hill Engineering
Contract #: N69450-18-C-8815
Contract Amount: $580,628
Work included modification, repair, and replacement of the existing USN Dive School Piers. Pier 501 was extended an additional 36 feet increasing the structure to 268 SF. Pier 502 was completely removed and replaced. New pier was 67-feet by 4-feet, measuring 268 SF. Pier 503 was modified by removing 96 SF of the terminal platform and extending the dock 20 feet and installing a new perpendicular terminal platform measuring 110- foot by 8-foot increasing the structure to 1,352 SF.