PIERS 501, 502, AND 503

Client: NAVFAC Southeast
Dept. of Public Works
G. M. Hill Engineering

Contract #: N69450-18-C-8815

Contract Amount: $580,628

Work included modification, repair, and replacement of the existing USN Dive School Piers. Pier 501 was extended an additional 36 feet increasing the structure to 268 SF. Pier 502 was completely removed and replaced. New pier was 67-feet by 4-feet, measuring 268 SF. Pier 503 was modified by removing 96 SF of the terminal platform and extending the dock 20 feet and installing a new perpendicular terminal platform measuring 110- foot by 8-foot increasing the structure to 1,352 SF.

 