Client: United Tugs c/o
U. S. Coast Guard
Civil Engineering
Unit – Miami
Contract #: 10902414
Contract Amount: $435,000
Project required underwater demolition of the existing range structure. In-house design, fabrication, and installation of a new range light structure meeting optical navigational height as required for the existing range system. Installation of structure included driving 135′ long 12.75″ steel pipe piles, 100′ long 18″ steel pipe pile, 10’x10′ platform with handrails and fiberglass grating, optics platform, and solar power stand.