REBUILD ST. JOSPEH BAY ENTRANCE A RFL AND ENTRANCE C RRL

Client: U. S. Coast Guard Civil Engineering Unit – Miami Contract #: 70Z08219DPMV11600 Contract Amount: $1,686,412 Project required the demolition of the existing 54″ dia. concrete monopile and 42″ dia. steel monopile structures. Design, fabricate, and install two new range light structures meeting optical navigational height as required for the existing range system. Installation of…

MULLET KEY CHANNEL RANGE FRONT LIGHT EMERGENCY REPLACEMENT

Client: United Tugs c/o U. S. Coast Guard Civil Engineering Unit – Miami Contract #: 10902414 Contract Amount: $435,000 Project required underwater demolition of the existing range structure. In-house design, fabrication, and installation of a new range light structure meeting optical navigational height as required for the existing range system. Installation of structure included driving…

CALCASIEU EAST JETTY AID TO NAVIGATION STRUCTURE REPLACEMENT

Client: U.S. Coast Guard Civil Engineering Unit – Miami Contract #: HSCG82-17-J-PMV252 Contract Amount: $747,831 Work included In-House Design, Fabrication, and Installation of a three pipe pile navigation structure. The structure had three 175′ long driven pipe piles and one 90′ sacrificial pipe pile, all 24″ diameter. The navigational structure includes 65,000 lbs of fabricated…

PIERS 501, 502, AND 503

Client: NAVFAC Southeast Dept. of Public Works G. M. Hill Engineering Contract #: N69450-18-C-8815 Contract Amount: $580,628 Work included modification, repair, and replacement of the existing USN Dive School Piers. Pier 501 was extended an additional 36 feet increasing the structure to 268 SF. Pier 502 was completely removed and replaced. New pier was 67-feet…

WHARF REPAIRS

Client: U.S. Army Corps of Engineers Wilmington District Contract #: W912PM-17-C-0013 Contract Amount: $2,762,232 Project included 2,000 LF of epoxy injection crack repairs along eight (8) center wharf concrete beams, replacement of the South Wharf fender system, replacement of the North Wharf fender piles and wales. Install two new concrete piles and incorporated deck tie-in…

LCU RAMP REPAIRS

Client: U.S. Army Corps of Engineer Wilmington District Contract #: W912PM-17-C-0022 Contract Amount: $1,035,178 Project included installation of concrete floating docks, precast concrete pilings, steel sheet pile breakwater, rip rap stone shoreline protection, rebuilding of existing timber docks. Installation of temporary cofferdam and dewatering system, demolition of existing articulated concrete ramp, and installation of new…

BAY COUNTY BOAT RAMPS POST HURRICANE MICHAEL STORM REPAIRS

Client: Bay County Board of County Commissioners Contract #: 19-144 Contract Amount: $321,456 Work included Design, Fabrication, and Installation of a three pipe pile navigation structure. The structure had three 175′ long driven pipe piles and one 90′ sacrificial pipe pile, all 24″ diameter. The navigational structure includes 65,000 lbs of fabricated steel with galvanized…

BRIDGE REPAIRS AND REHABILITATION

Client: Florida Department of Transportation District 1 Contract #: E1P56 Contract Amount: $1,109,997 Project included spall repairs, pile cap replacement and repairs, cathodic protection pile jackets, crack injection repairs, fabrication and installation of a new steel ladder access system, and application of 16,200 SF of two-part epoxy and aggregate overlay system on bridge deck.