Client: U.S. Army Corps
of Engineer Wilmington District
Contract #: W912PM-17-C-0022
Contract Amount: $1,035,178
Project included installation of concrete floating docks, precast concrete pilings, steel sheet pile breakwater, rip rap stone shoreline protection, rebuilding of existing timber docks. Installation of temporary cofferdam and dewatering system, demolition of existing articulated concrete ramp, and installation of new cast-in-place concrete ramps.