United States Coast Guard, CEU Cleveland Contract No: HSCG83-17-C-PCR002 Contract Amount: $1,981,980.00 Performance Period: 300 Days (3/6/2017 – 12/31/2017) POC: Verona M. Wolfe (216) 902-6265
Tag Archives: pier repairs
Sunshine Skyway Bridge Rehabilitation, Tampa, Florida
Inland was awarded a contract by the Florida Department of Transportation to rehabilitate the North & South fishing piers of the Sunshine Skyway Bridge in Tampa, Florida. Work includes cathodic protection pile jacket systems, metalizing, concrete spall repairs and concrete hand railing replacement. Sunshine Skyway Fishing Pier at St. Petersburg, Florida Florida Department of Transportation […]
George Crady Fishing Pier Bridge Repairs
Florida Department of Environmental Protection Contract No: BDC18-10/11 (188-01) Contract Amount: $418,425.81 Performance Period: 150 Days (2/11/2011 – 7/11/2011) Completed 5/20/2011 POC: Marlon Orellana, Project Manager (727) 938-6478 Install scour protection measures at George Crady Bridge to include bank and shore protection rip rap, bedding stone, gabion stone baskets, and geotextile fabric. Project completed 45 […]
Waterfront Repairs
USCG Station Gulfport, Mississippi Contract No: HSCG82-08-C-3WCA22 Contract Amount: $332,554.00 Performance Period: 180 Days (4/01/08 – 6/15/2008) POC: Odalys McGee, USCG Civil Engineering Unit – Miami Perform waterfront repairs to include the installation of rubber dock fenders, galvanized hardware, cleats, shore power, removal and replacement of gas and diesel above ground storage tanks , piping […]
Hurricane Erosion Stabilization @ USCG Station Ft. Pierce, Florida
HSCG82-05-C-3WCA31 US Coast Guard Civil Engineering Unit – Miami Contract Amount: $409,009.50 Performance Period: 90 Days (4/2005 – 7/2005) POC: LTJG Eric Larsen – CEU Miami Excavate and backfill damaged shoreline with barrow fill, install geotextile fabric and FDOT 530 class rip rap. Demolish and dispose of existing timber dock & timber fenders. Install new […]
Hurricane Frances Repairs @ USCG Station Ft. Pierce, Florida
DTCG82-04-D-3WCA33 Task Order #1 US Coast Guard Civil Engineering Unit – Miami Contract Amount: $359,679 Performance Period: 90 Days (12/2004 – 3/2005) POC: LTJG Eric Larsen, CEU – Miami Perform miscellaneous repairs to structures and facilities