Design & Build Roof Replacement Building 827, US Air Force

Inland was awarded a design and build roof replacement project for the US Air Force at Little Rock Air Force Base, Arkansas. Design/Build Roof Replacement Building 827 US Air Force Little Rock AFB, Arkansas Department of the Air Force, 19th Contracting Squadron (Prime Contractor) Contract No: FA4460-15-C-0010 Contract Amount: $822,516.36 Performance Period: 210 Days (9/23/2015 […]

Design & Build Storm Sewer Systems, Mobile AL

Inland was awarded a design and build contract to remove and upgrade existing storm sewer systems for the US Coast Guard Civil Engineering Unit at Sector Mobile, Alabama. Design/Build Storm Drainage Systems Coast Guard Sector Mobile, Alabama US Coast Guard Civil Engineering Unit Miami (Prime Contractor) Contract No: HSCG82-10-D-PMVA36 / Task Order No: HSCG82-15-J-PMV169 Contract […]

Design/Build North Jetty Light at Coast Guard Ponce De Leon Inlet, Florida

US Coast Guard Civil Engineering Unit Miami (Prime Contractor) Contract No: HSCG82-14-C-PMV097 Contract Amount: $335,723.00 Performance Period: 150 Days (6/1/2014 – 11/1/2014) POC: Lesia Moyer, Contracting Officer, 305-278-6725 Demolition and remove existing navigation structure and light. Construct new aid-to-navigation tower structure and install designated navigation equipment.

Design/Build Acoustic Test Pier – Naval Support Activity

Panama City, Florida Department of the Navy / American Contractor & Technology, Inc. (Subcontractor) Contract No: N69450-13-C-6084 Subcontract No: 13-189-01 Contract Amount: $1,232,778.00 Performance Period: 365 Days (03/23/13 – 3/22/2014) POC: Teresa Gelormini, Project Manager, (850) 932-9775 Demolition of existing metal building and timber pier, dredging of acoustic test facility to plan elevations. Installation of […]

Design/Build Pier Victor Repairs

US Department of the Navy / Lakeshore TolTest, Inc. US Naval Base Guantanamo Bay, Cuba Contract No: N69450-08-D-1283/Task Order No: 0008/Subcontract No: P005925 Contract Amount: $3,715,000 Performance Period: 410 Days (11/1/2011 – 6/1/2013) POC: Nick Nemire, Project Manager (419) 794-3556 Perform dive inspections of affected areas of deterioration, develop scope of work, plans and specifications. […]

Design/Build Sandy Hook Ferry Dock

replace dock

Department of the Interior/National Park Service Contract No: 1443C2051090H14 Contract Amount: $1,846,791.00 Performance Period: 240 Days (9/24/2009 – 5/31/2010) POC: Trinity Maestas-Lintz Demolition of deteriorated existing ferry dock and gangway. Design new access pier, gangways, and barge. Install spud piles for ferry dock/barge, install pile bents for new gangways, construct access pier and sidewalks. Work […]

Design/Build Mud Island Front & Rear Range Lights

relocate range lights 1

USCG ANT Philadelphia, Pennsylvania Contract No: HSCG83-09-C-3WQ053 Contract Amount: $815,667.02 Performance Period: 120 Days (3/2/2009 – 7/2/2009) POC: Laurie Walker, USCG Civil Engineering Unit – Cleveland Design new range light tower, build new three steel pipe pile support range light, boat landing, tower, deck, grating, derrick and solar panel. Fabricate, deliver, and erect second range […]

Design/Build West Ramp Apron & Wash Rack Airfield Pavements Phase II

USCG Support Center Elizabeth City, North Carolina Contract No: HSCG83-08-C-3WG064 Contract Amount: Design: $126,000.00 Build: $2,224,000.00 Performance Period: 60 Days (9/22/2008 – 11/22/2008) POC: Pamela Komer, USCG Civil Engineering Unit – Cleveland Design new concrete apron pavements to replace failed pavements due to soil stabilization issues. Pavements include west ramp concrete apron and wash rack. […]

Design/Build Runway & Apron Pavements Phase I

USCG Support Center Elizabeth City, North Carolina Contract No: HSCG83-07-D-3WG018 Contract Amount: Design: $136,570.71 Build: $2,896,926.00 Performance Period: 180 Days (Design & Build) (6/27/2007 – 12/30/2007) POC: Pamela Komer, USCG Civil Engineering Unit – Cleveland Design new runway pavements to replace existing failed runway due to soil stabilization issues. Pavements included runway 10/28, taxiway & […]