Florida Department of Environmental Protection/Gulf Group, Inc. (Subcontractor) Contract No: CN157 Contract Amount: $1,643,000 Performance Period: 320 Days (4/14/2015 – 1/14/2016) POC: Kyle Bordelon, Project Manager (850) 785-0592 Demolition of concrete bridge abutments and install new concrete abutments, two 31’ reinforced concrete pedestrian bridges, one 93’ span structural steel pedestrian bridge, new FDOT aluminum hand […]
Tag Archives: bridge construction
Construct Waesche Avenue Bridge

USCG Yard Baltimore, Maryland Contract No: HSCG83-09-C-3D102 Contract Amount: $862,597.52 Performance Period: 120 Days (3/16/2009 – 7/16/2009) POC: Pamela Komer, USCG Civil Engineering Unit – Cleveland Demolish existing concrete bridge deck, guardrails, and concrete pile caps. Form new pile caps utilizing existing concrete pilings for bridge bents. Pour in place new concrete bridge pile bents, […]
Construct A-10 Bridge
Santa Rosa Range Complex, Florida Contract No. 807608 Contract Amount: $754,804.60 Performance Period: 120 days (2/15/07 – 6/30/07) POC: Scott Dunbar, CH2M Hill Constructors, Inc. Construct new bridge rated for 40 tons. Construct detour road as bypass, install permanent sheet piling (1000 LF), pour in place concrete pile caps, drive permanent concrete pilings, pour in […]