Sunshine Skyway Bridge Rehabilitation, Tampa, Florida

Inland was awarded a contract by the Florida Department of Transportation to rehabilitate the North & South fishing piers of the Sunshine Skyway Bridge in Tampa, Florida. Work includes cathodic protection pile jacket systems, metalizing, concrete spall repairs and concrete hand railing replacement.

Sunshine Skyway Fishing Pier at St. Petersburg, Florida
Florida Department of Transportation (Prime Contractor)
Contract No: E7K13
Contract Amount: $5,076,079.79
Performance Period: 455 Days (2/9/2015 – 5/10/2016)
POC: Jonathan Gill, Project Administrator (727) 512-5204

Perform concrete spall repairs on pile caps, beams, underdeck, topside, concrete railings and cathodic protection pile jackets on 110 concrete piles. Zinc metalizing for concrete beams and pile caps, replace 1,400 linear feet of expansion joint and concrete guard rail replacement.

Tags: , , ,