Client: U. S. Coast Guard CEU – Miami
Contract #: 70Z08222FABCD0024
Contract Amount: $3,129,242
Work consisted of demolition of 2,560 sf of existing concrete pier ramp, removal of 22 existing timber fender piles, installation of 21 new timber fender piles and 64 conical pile covers. Designed and installed 28 structural cathodic protection pile jackets. Constructed 2,560 sf of new concrete pile caps, beams, and deck ( elevated ramp structure). Installed new fender cocks, wales, fenders, mooring hardware and guardrails. Installed 7 concrete pile jackets and 29 timber pile jackets. Repaired concrete pile caps / end beam spalls. Installed 69 new timber cross bracings. Repaired concrete under deck spalls, 144 lf of concrete slab joints, and 710 lf of full depth cracks in existing concrete deck.