Roof Replacements Main Post Office & Vehicle Maintenance Facility Columbus, Ohio

US Postal Service Eastern Facilities Construction CMT (Prime Contractor) Contract No: 360070-13-B-0039 Contract Amount: $3,356,159.92 Performance Period: 365 Days (8/13/2013 – 8/14/2014) POC: John Sweany, Construction Manager, 330-923-8461 Remove 248,250 square feet of existing Duro-Last PVC single ply roof system and replace with Versico 80 Mil single ply PVC roofing system. Install 220 new roof…

Roof Replacement at Coast Guard Sector New Orleans, Louisiana

US Coast Guard Civil Engineering Unit Miami (Prime Contractor) Contract No: HSCG82-10-D-PMVA36 / Task Order No: HSCG82-15-R-PMV043 Contract Amount: $521,900.05 Performance Period: 120 Days (1/9/2015 – 5/27/2015) POC: Carlos Garcia, Contracting Officer (305) 278-6722 Removal of 20,000 square feet of existing modified bitumen roofing system, and installation of torch/hot mopped modified roofing system with new…

Roof Replacement at Main Post Office Savannah, Georgia

US Postal Service Northern Facilities Construction CMT (Prime Contractor) Contract No: 089495-14-B-0103 Contract Amount: $762,000.16 Performance Period: 250 Days (1/29/2015 – 9/19/2015) POC: Richard Russo, Contract Specialist (860) 285-7014 Removal of 65,000 square feet of existing EPDM and built-up roof systems and installation of new 60 MIL PVC roofing system with interior drain systems.

Miscellaneous Project Repairs

US Coast Guard Air Station New Orleans, Louisiana Contract No: HSCG82-10-C-PMVA07 Contract Amount: $672,175.00 Performance Period: 180 Days (1/25/2010 – 9/30/2010) POC: Lesia Moyer, USCG Civil Engineering Unit – Miami Remove existing ceilings and components, remove and replace existing air conditioning systems including air handling units, condensing units, associated piping, controls and ductwork. Preparation of…

DESIGN BUILD SHIPPING CHANNEL RANGE LIGHTS

Client: U.S. Coast Guard CEU Miami Contract #: HSCG82-10-D-PMVA36 Contract Amount: $786,868 Project required demolition and replacement of existing Aids to Navigation (ATON) structures. Engineering Design, In-House Fabrication, and installation of two new ATON structures at Matagorda Ship Channel and Colorado River West Jetty entrance. Driven pipe piles, cast-inplace concrete, metal fabrication, and coatings. Solar…

DESIGN BUILD ACOUSTIC TEST FACILITY PIER

Client: U.S. Navy NAVFAC SE ACT, Inc. Contract #: N69450-13-C-6084 Contract Amount: $1,161,500 Project included demolition of existing metal building, concrete pier and pilings. Dredging for new pier construction, drive in place 12 pre-stressed concrete pilings (18″x 60′), install prestressed concrete beams, deck panels and pour in place” pier covering. Erect new pre-engineered metal building,…