Hurricane Rita Concrete Repairs
USCG Air Station Houston, Texas
Contract No. HSCGG1-06-C-3WC385
Contract Amount: $271,656.00
Performance Period: 150 days (8/14/06 – 1/12/07)
POC: Jerry Fortin, USCG Civil Engineering Unit – Providence
Breakout and replace failed concrete on airfield apron and taxiway, remove and replace joint sealant, breakout and repair concrete spalls in three trench drains inside of aircraft hanger, repair interior cracks in hanger building, remove concrete steel hanger door rails and replace with new steel rails and concrete. FOD protection measures and cleanup.