Construct Site Repairs, Underground Utilities, and Parking Lot

USCG Station Sabine Pass, Texas Contract No: HSCG82-09-C-3WCA06 Contract Amount: $718,453.00 Performance Period: 120 Days (04/01/2009 – 08/01/2009) POC: Lesia K. Moyer, USCG Civil Engineering Unit – Miami Demolitions and disposal of the existing underground utilities, manholes, inlets, and valves. Install new storm water piping, inlets, and manholes. Install new water lines, fuel dispensing systems, […]

Expand Parking Lot #5

VA Medical Center North Florida/South Georgia Healthcare System Gainesville, Florida Contract No. V573C-535 Contract Amount: $413,053.30 Performance Period: 235 days POC: Donna Nelson, Contracting Officer Demolish portions of existing parking lot for medical center. Install new storm drainage pipe, curb & gutter, backfill, grade, compaction, install concrete sidewalks, asphalt paving, parking lot striping, and vehicle […]

Storm Drainage Improvements

Hurlburt Field Air Force Base, Florida Contract No. 808106 Contract Amount: $828,634.37 Performance Period: 120 days (1/18/07 – 5/25/07) POC: Scott Dunbar, CH2M Hill Constructors, Inc. Remove existing storm drainage reinforced concrete pipe, install new 60” & 48” reinforced concrete pipe, concrete headwall, new concrete inlets, saddle inlets, curb inlets with manholes, breakout and remove […]

Construct Pump Shop & Locker Room

USCG Air Station Clearwater, Florida Contract Number: HSCG82-06-C-3WCA01 Contract Amount: $472,360.47 Performance Period: 210 days (11/7/05 – 6/20/06) POC: Odalys McGee, USCG Civil Engineering Unit – Miami Construct new pump shop & locker room. Construction included pour in place concrete slab, underground utilities, CMU block walls, metal purlins, metal roofing, skylights, interior construction, tile, drywall, […]

Mazoue Ditch Drainage Improvements – Phase 1

Jefferson Parish Project Number: 93-010A-DR Jefferson Parish, Louisiana Contract Amount: $814,650 Performance Period: 270 days (6/28/2004 – 3/1/2005) POC: James Ray – Meyer Engineers, Ltd Excavation and embankment fill, installation of 1000 LF of steel sheet piles, install concrete ditch bottom paving, concrete pile cap, steel pile cap, storm drainage improvements, 12”, 21” & 24” […]