Gulf Strike Team (GST) Hanger/Warehouse Roof Replacement

U.S. Coast Guard Civil Engineering Unit- Miami Contract No: HSCG82-10-D-PMVA36 / Task Order HSCG82-12-J-3AT002 Contract Amount: $412,205.61 Performance Period: 270 Days (2/20/2012 – 11/22/2012) POC: Rabon Lewis, Contracting Officer, CEU Miami, 305-278-6731 Remove existing aluminum metal roofing system from GST Hanger and Warehouse. Replace approximately 50,000 square feet of roof with seamless metal roofing, gutters […]

Roof Building 464 Offutt Air Force Base, Nebraska

Department of the Air Force, 55th Contracting Squadron Contract No: FA4600-10-C-0013 Contract Amount: $335,622.00 Performance Period: 180 Days (4/15/2011 – 6/4/2011) POC: David Neal, Contract Specialist (402) 232-8659 Remove existing roof next to active flight line. Install new roof trusses, insulation and Thermoplastic Membrane Roofing (TPO). Work completed four months ahead of schedule.

Miscellaneous Project Repairs

air station construction and repairs

US Coast Guard Air Station New Orleans, Louisiana Contract No: HSCG82-10-C-PMVA07 Contract Amount: $672,175.00 Performance Period: 180 Days (1/25/2010 – 9/30/2010) POC: Lesia Moyer, USCG Civil Engineering Unit – Miami Remove existing ceilings and components, remove and replace existing air conditioning systems including air handling units, condensing units, associated piping, controls and ductwork. Preparation of […]

Hurricane Ike Repairs

USCG Station Sabine Pass, Texas Contract No: HSCG82-09-C-3WCA23 Contract Amount: $403,386.00 Performance Period: 90 Days (3/2/2009 – 6/2/2009) POC: Lesia Moyer, USCG Civil Engineering Unit – Miami Perform miscellaneous repairs to multiple buildings (multi discipline). Remove and replace damaged doors, perform roofing repairs, repair fuel tank and fuel distribution systems, remove and replace security fencing, […]

ReRoof Station Housing Units (14)

USCG Station Sault Ste. Marie, Michigan Contract No: HSCG83-08-C-3WT165 Contact Amount $447,941.87 Performance Period: 120 Days (8/18/2008 – 12/18/2008) POC: Carolyn Melton, USCG Civil Engineering Unit – Cleveland Remove and replace asphalt shingle roofing system on fourteen (14) housing units. Work includes removal and replacing tongue and grooved wood decking, ice/dam, 30# felt, metal flashing […]

Roof Main Station Buildings

USCG Station Sault Ste. Marie, Michigan Contract No: HSCG83-08-C-3WT014 Contact Amount: $473,438.00 Performance Period: 120 Days (4/5/08 – 8/1/2008) POC: Pamela Komer, USCG Civil Engineering Unit – Cleveland Remove and replace roofing system on four of the main station buildings. Replace existing roof drains, install five additional roof drains, and install tapered insulation (crickets) to […]

Construct Building 531

Tyndall Air Force Base, Florida Contract No: 809679 Contract Amount: $191,688.00 Performance Period: 60 days (8/15/2007 – 10/15/2007) POC: Rocky Lorenz, CH2M Hill Constructors, Inc., Construct new masonry block building for the Air Force. Poured in place slab on grade, place CMU walls, install roof trusses, roof decking, pour in place insulation in block walls, […]

Buildings 2270 & 517 Restoration (Hurricane Ivan)

Corry Naval Station, Pensacola, Florida Contract No. 808488 Contract Amount: $449,889.42 Performance Period: 120 Days (4/23/2007 – 8/23/2007) POC: Scott Dunbar, CH2M Hill Constructors, Inc., Repair buildings damaged by Hurricane Ivan back to original condition. Work included installation of steel roof support system, removal and replacement of brick wall, removal and replacement of built up […]

ICE Fall Protection System

USCG LORAN Station Boise City, Felt, Oklahoma Contract No. HSCG82-06-C-3WCA44 Contract Amount: $238,116.04 Performance Period: 150 days (7/25/06 – 12/15/06) POC: Sherry Dague, USCG Civil Engineering Unit – Miami Fabricate and install new columns and ICE fall protection grating, concrete poured in place footings and supports, roofing repairs, copper cap, lightning protection certification for walkways […]

Hurricane Rita Roofing Repairs

USCG Station Galveston, Texas Contract No. HSCG82-06-C-3WCA22 Contract Amount: $748,654.70 Performance Period: 90 days (4/10/06 – 7/9/06) POC: Deborah Boydston, USCG Civil Engineering Unit Miami Perform roofing repairs to seven station buildings to include removal of asphalt shingles and replace, remove and replace gutters and downspouts, metal flashing, drip edges, soffit and fascia. Install new […]