Tag Archives: Hurricane repairs and rebuilds

Hurricane Ike Repairs

USCG Station Sabine Pass, Texas Contract No: HSCG82-09-C-3WCA23 Contract Amount: $403,386.00 Performance Period: 90 Days (3/2/2009 – 6/2/2009) POC: Lesia Moyer, USCG Civil Engineering Unit – Miami Perform miscellaneous repairs to multiple buildings (multi discipline). Remove and replace damaged doors, perform roofing repairs, repair fuel tank and fuel distribution systems, remove and replace security fencing, […]

Hurricane Dolly Tower Rebuilds

USCG Station South Padre Island, Texas Contract No: HSCG82-08-C-3WCA54 Contract Amount: $255,208.32 Performance Period: 45 Days (10/20/2008 – 12/04/2008) POC: Berta Gomez, USCG Civil Engineering Unit – Miami Demolish two damaged range light towers for shipping traffic in South Texas. Drive wood foundation piles (6) per each site. Pour in place concrete foundation for tower […]

Hurricane Ike Emergency Waterfront Structural Evaluations

USCG Sector Galveston, Texas Contract No: HSCG82-08-N-3WC281 Contract Amount: $58,702.00 Performance Period: 14 Days (9/22/2008 – 10/3/2008) POC: Odalys McGee, USCG Civil Engineering Unit – Miami Emergency requirement for underwater evaluations of remaining structures in wake of Hurricane Ike. Perform side scan sonar evaluations to determine debris field. Dive team performed underwater survey to determine […]

Hurricane Ike Emergency Debris Cleanup & Stockpile

USCG Sector Galveston, Texas Contract No: HSCG82-08-N-3WC292 Contract Amount: $136,490.00 Performance Period: 30 Days (9/19/2008 – 10/19/2008) POC: Odalys McGee, USCG Civil Engineering Unit – Miami Mobilize cleanup equipment to site immediately following Hurricane Ike to cleanup entire USCG Sector Base and stockpile debris onsite. Work performed in conjunction of emergency efforts to restore base […]

Hurricane Gustov Emergency Demolition of Eight Structures

USCG Station Gulfport, Mississippi Contract No: HSCG82-08-N-3WC264 Contract Amount: $74,972.48 Performance Period: 14 Days (9/5/2008 – 9/19/2008) POC: Odalys McGee, USCG Civil Engineering Unit – Miami Mobilized and demolish eight existing structures damaged/destroyed by tidal surge from Hurricane Gustov. Demolish, haul out of materials to landfill and restore site to grade.

Buildings 2270 & 517 Restoration (Hurricane Ivan)

Corry Naval Station, Pensacola, Florida Contract No. 808488 Contract Amount: $449,889.42 Performance Period: 120 Days (4/23/2007 – 8/23/2007) POC: Scott Dunbar, CH2M Hill Constructors, Inc., Repair buildings damaged by Hurricane Ivan back to original condition. Work included installation of steel roof support system, removal and replacement of brick wall, removal and replacement of built up […]

Emergency Repairs to Range Lights Government Cut

USCG Aid to Navigation Fort Lauderdale, Florida Contract No: HSCG82-07-C-3WCA06 Contract Amount: $426,648.00 Performance Period: 110 Days (4/9/2007 – 7/23/2007) POC: Odalys McGee, USCG Civil Engineering Unit – Miami Design/Build new steel range light structures for two damaged ranges from Hurricanes. Fabricate new steel supports and install, replace fiberglass deck grating, removal of government owned […]

Hurricane Rita Emergency Repairs to Matagorda Range Light B

USCG Station Port O’Conner, Texas Contract No. HSCG82-06-C-3WCA63 Contract Amount: $213,451.00 Performance Period: 21 days (9/1/06 – 9/22/06) POC: Billie Jo Cherico, USCG Civil Engineering Unit – Miami Remove existing damaged range light on water, mobilize marine barge, crane and equipment, fabricate new range light, install new range light and replace government furnished navigation lights […]

Hurricane Rita Pavement Repairs

USCG Station Port Aransas, Texas Contract No. HSCGG1-06-C-3WC378 Contract Amount: $140,018.00 Performance Period: 120 days (8/28/06 – 12/7/06) POC: Jerry Fortin, USCG Civil Engineering Unit – Providence Construct new parking lot, remove existing grass, install new base material, install concrete junction boxes, install asphalt for new parking lot, install asphalt pavement overlay on existing parking […]

Hurricane Rita Concrete Repairs

USCG Air Station Houston, Texas Contract No. HSCGG1-06-C-3WC385 Contract Amount: $271,656.00 Performance Period: 150 days (8/14/06 – 1/12/07) POC: Jerry Fortin, USCG Civil Engineering Unit – Providence Breakout and replace failed concrete on airfield apron and taxiway, remove and replace joint sealant, breakout and repair concrete spalls in three trench drains inside of aircraft hanger, […]