Tag Archives: general contractors TX

Construct Covered Moorings

USCG Station Freeport, Texas Contract No: HSCG82-08-C-3WCA31 Contract Amount: $778,977.00 Performance Period: 240 Days (8/15/2008 – 4/15/2009) Ongoing POC: Sherry Dague, USCG Civil Engineering Unit – Miami Install new concrete floating dock. Drive five (5) concrete pilings to support floating dock. Breakout and replace concrete slab on grades for fuel farm, and support buildings. Erect […]

Door Replacement

USCG Station Galveston, Texas Contract No. HSCG82-06-N-3WC415 Contract Amount: $99,861.00 Performance Period: 120 Days (12/8/06 – 3/8/07) POC: Ada Hoggard, USCG Civil Engineering Unit – Miami Remove existing double doors at warehouse building and single doors for flammable storage locker. Replace with fiberglass doors, new hardware and locksets.

Hurricane Rita Emergency Repairs to Matagorda Range Light B

USCG Station Port O’Conner, Texas Contract No. HSCG82-06-C-3WCA63 Contract Amount: $213,451.00 Performance Period: 21 days (9/1/06 – 9/22/06) POC: Billie Jo Cherico, USCG Civil Engineering Unit – Miami Remove existing damaged range light on water, mobilize marine barge, crane and equipment, fabricate new range light, install new range light and replace government furnished navigation lights […]

Hurricane Rita Pavement Repairs

USCG Station Port Aransas, Texas Contract No. HSCGG1-06-C-3WC378 Contract Amount: $140,018.00 Performance Period: 120 days (8/28/06 – 12/7/06) POC: Jerry Fortin, USCG Civil Engineering Unit – Providence Construct new parking lot, remove existing grass, install new base material, install concrete junction boxes, install asphalt for new parking lot, install asphalt pavement overlay on existing parking […]

Hurricane Rita Concrete Repairs

USCG Air Station Houston, Texas Contract No. HSCGG1-06-C-3WC385 Contract Amount: $271,656.00 Performance Period: 150 days (8/14/06 – 1/12/07) POC: Jerry Fortin, USCG Civil Engineering Unit – Providence Breakout and replace failed concrete on airfield apron and taxiway, remove and replace joint sealant, breakout and repair concrete spalls in three trench drains inside of aircraft hanger, […]

Hurricane Rita Breakwater Repairs

USCG Station Galveston, Texas Contract No. HSCG82-06-C-3WCA31 Contract Amount: $763,049.47 Performance Period: 120 days (5/1/06 – 8/29/06) POC: Deborah Boydston, USCG Civil Engineering Unit Miami Remove failed breakwater seawall, remove concrete pile cap and concrete sheet piles, drive new concrete sheet piles, drive new concrete batter piles, pour-in-place new concrete pile cap. Remove and install […]

Hurricane Rita Roofing Repairs

USCG Station Galveston, Texas Contract No. HSCG82-06-C-3WCA22 Contract Amount: $748,654.70 Performance Period: 90 days (4/10/06 – 7/9/06) POC: Deborah Boydston, USCG Civil Engineering Unit Miami Perform roofing repairs to seven station buildings to include removal of asphalt shingles and replace, remove and replace gutters and downspouts, metal flashing, drip edges, soffit and fascia. Install new […]