Inland Construction and Engineering, Inc., was awarded a project for the US Army Corps of Engineers to install cathodic protection pile jacket systems on the center wharf and complete concrete spall repairs to the topside and under deck of the wharf. Center Wharf Pile Repairs at Military Ocean Terminal Sunny Point, North Carolina US Army […]
Tag Archives: general contractors NC
Roof Replacement Phase V, Butner NC
Inland was awarded a contract to remove and replace roofing systems on five buildings for the Federal Bureau of Prisons in Butner, NC. 50,000 total square feet of roofing systems. Roof Replacement Phase V Federal Correctional Complex Butner, North Carolina Federal Bureau of Prisons (Prime Contractor) Contract No: DJBP016N7U10001 Contract Amount: $986,216.64 Performance Period: 544 […]
HVAC Upgrades, at Coast Guard Station Wrightsville Beach, North Carolina
US Coast Guard Civil Engineering Unit Cleveland/LSCAR (Subcontractor) Contract No: HSCG83-14-C-PRC167 Contract Amount: $607,760.46 POC: Verona Wolfe, Contracting Officer, USCG CEU Cleveland, 206-902-6265 Demolition and replacement of existing HVAC system, acoustical ceilings, and closed cell form installation.
Repair Taxiway Bravo – Coast Guard Base Elizabeth City, North Carolina
US Coast Guard Civil Engineering Unit Cleveland / LSCAR, LLC (Subcontractor) Contract No: HSCG83-13-R-PCR258 Subcontract No: LSCAR3065 Contract Amount: $400,000.00 Performance Period: 60 Days (12/02/2013 – 02/02/2014) POC: Solomon Locklear, VP – LSCAR, LLC, 910-521-0724 Replace 50’ wide by 254’ area of airport taxiway concrete pavement as full replacement to include demolition and removal of […]
Roof Replacement Phase 4 – Federal Correction Complex Butner, North Carolina
Federal Bureau of Prisons (Prime Contractor) Contract No: DJBP0106L1X10001 Contract Amount: $1,050,935.67 Performance Period: 730 Days (9/4/2012 – 9/3/2014) Completed 12/20/2013 POC: Mellissa Rhinehart, Contracting Officer, (301) 317-3255 Remove and replace 60,000 square feet of foam and modified roofing system on five active prison buildings. New roofing system includes roof drains, metal coping and accessories. […]
Waste Water Treatment Plant & Drainfield
Coast Guard Station Atlantic Beach, North Carolina Contract No: HSCG83-10-C-PCU058 Contract Amount: $1,011,654.99 Performance Period: 175 Days (5/1/2010 – 10/30/2010) POC: Pamela Komer, USCG CEU Cleveland, (216) 902-6216 Construct new waste water treatment plant (WWTP) and drainfield to replace failing plant. Demolish and dispose of existing waste water treatment plant, site grading, seeding, electrical upgrades. […]
Breakwater Replacement

US Army Corps of Engineers District, Wilmington Contract No: W912HN-10-C-0001 Contract Amount: $2,968,223.04 Performance Period: 375 Days (2/10/2010 – 3/14/2011) POC: William Talley, USACE Wilmington, (910) 251-4817 Demolish and replace deteriorated timber breakwater in Belhaven, North Carolina. Drive in place new permanent timber piling breakwaters, demolish existing breakwaters. Inland submitted a Value Engineering Change Proposal […]
Design Hanger 75 & Hanger 79 Aircraft Parking Apron Pavements Phase III

USCG Section Elizabeth City, North Carolina Contract No: HSCG83-08-D-3WG064 Contract Amount: $30,774.37 Performance Period: 60 Days (8/1/2008 – 9/30/2008) POC: Pamela Komer, USCG Civil Engineering Unit – Cleveland Click any photo to open slideshow.
Design/Build West Ramp Apron & Wash Rack Airfield Pavements Phase II
USCG Support Center Elizabeth City, North Carolina Contract No: HSCG83-08-C-3WG064 Contract Amount: Design: $126,000.00 Build: $2,224,000.00 Performance Period: 60 Days (9/22/2008 – 11/22/2008) POC: Pamela Komer, USCG Civil Engineering Unit – Cleveland Design new concrete apron pavements to replace failed pavements due to soil stabilization issues. Pavements include west ramp concrete apron and wash rack. […]
Design/Build Runway & Apron Pavements Phase I
USCG Support Center Elizabeth City, North Carolina Contract No: HSCG83-07-D-3WG018 Contract Amount: Design: $136,570.71 Build: $2,896,926.00 Performance Period: 180 Days (Design & Build) (6/27/2007 – 12/30/2007) POC: Pamela Komer, USCG Civil Engineering Unit – Cleveland Design new runway pavements to replace existing failed runway due to soil stabilization issues. Pavements included runway 10/28, taxiway & […]