Roof Replacement Phase V, Butner NC

Inland was awarded a contract to remove and replace roofing systems on five buildings for the Federal Bureau of Prisons in Butner, NC. 50,000 total square feet of roofing systems. Roof Replacement Phase V Federal Correctional Complex Butner, North Carolina Federal Bureau of Prisons (Prime Contractor) Contract No: DJBP016N7U10001 Contract Amount: $986,216.64 Performance Period: 544 […]

Repair Taxiway Bravo – Coast Guard Base Elizabeth City, North Carolina

US Coast Guard Civil Engineering Unit Cleveland / LSCAR, LLC (Subcontractor) Contract No: HSCG83-13-R-PCR258 Subcontract No: LSCAR3065 Contract Amount: $400,000.00 Performance Period: 60 Days (12/02/2013 – 02/02/2014) POC: Solomon Locklear, VP – LSCAR, LLC, 910-521-0724 Replace 50’ wide by 254’ area of airport taxiway concrete pavement as full replacement to include demolition and removal of […]

Roof Replacement Phase 4 – Federal Correction Complex Butner, North Carolina

Federal Bureau of Prisons (Prime Contractor) Contract No: DJBP0106L1X10001 Contract Amount: $1,050,935.67 Performance Period: 730 Days (9/4/2012 – 9/3/2014) Completed 12/20/2013 POC: Mellissa Rhinehart, Contracting Officer, (301) 317-3255 Remove and replace 60,000 square feet of foam and modified roofing system on five active prison buildings. New roofing system includes roof drains, metal coping and accessories. […]

Waste Water Treatment Plant & Drainfield

Coast Guard Station Atlantic Beach, North Carolina Contract No: HSCG83-10-C-PCU058 Contract Amount: $1,011,654.99 Performance Period: 175 Days (5/1/2010 – 10/30/2010) POC: Pamela Komer, USCG CEU Cleveland, (216) 902-6216 Construct new waste water treatment plant (WWTP) and drainfield to replace failing plant. Demolish and dispose of existing waste water treatment plant, site grading, seeding, electrical upgrades. […]

Breakwater Replacement

construction companies in NC

US Army Corps of Engineers District, Wilmington Contract No: W912HN-10-C-0001 Contract Amount: $2,968,223.04 Performance Period: 375 Days (2/10/2010 – 3/14/2011) POC: William Talley, USACE Wilmington, (910) 251-4817 Demolish and replace deteriorated timber breakwater in Belhaven, North Carolina. Drive in place new permanent timber piling breakwaters, demolish existing breakwaters. Inland submitted a Value Engineering Change Proposal […]

Design/Build West Ramp Apron & Wash Rack Airfield Pavements Phase II

USCG Support Center Elizabeth City, North Carolina Contract No: HSCG83-08-C-3WG064 Contract Amount: Design: $126,000.00 Build: $2,224,000.00 Performance Period: 60 Days (9/22/2008 – 11/22/2008) POC: Pamela Komer, USCG Civil Engineering Unit – Cleveland Design new concrete apron pavements to replace failed pavements due to soil stabilization issues. Pavements include west ramp concrete apron and wash rack. […]

Design/Build Runway & Apron Pavements Phase I

USCG Support Center Elizabeth City, North Carolina Contract No: HSCG83-07-D-3WG018 Contract Amount: Design: $136,570.71 Build: $2,896,926.00 Performance Period: 180 Days (Design & Build) (6/27/2007 – 12/30/2007) POC: Pamela Komer, USCG Civil Engineering Unit – Cleveland Design new runway pavements to replace existing failed runway due to soil stabilization issues. Pavements included runway 10/28, taxiway & […]