Design & Build Storm Sewer Systems, Mobile AL

Inland was awarded a design and build contract to remove and upgrade existing storm sewer systems for the US Coast Guard Civil Engineering Unit at Sector Mobile, Alabama. Design/Build Storm Drainage Systems Coast Guard Sector Mobile, Alabama US Coast Guard Civil Engineering Unit Miami (Prime Contractor) Contract No: HSCG82-10-D-PMVA36 / Task Order No: HSCG82-15-J-PMV169 Contract […]

Roof Replacement at Main Post Office Decatur, Alabama

US Postal Service Northern Facilities Construction CMT (Prime Contractor) Contract No: 089495-14-B-0094 Contract Amount: $500,156.37 Performance Period: 180 Days (2/10/2015 – 8/5/2015) POC: Richard Spreitzer, COTR (502) 741-2218 Removal of 27,500 square feet of existing built-up roof system, and install new 60 MIL PVC roof system with new interior drains.

Roof Replacement Main Supply Office at Coast Guard Air Station Mobile, Alabama

US Coast Guard Civil Engineering Unit Miami (Prime Contractor) Contract No: HSCG82-10-D-PMVA36 / Task Order No: HSCG82-15-R-PMV014 Contract Amount: $391,000 Performance Period: 90 Days (2/9/2015 – 5/10/2015) POC: Jerry Willhite, Construction Manager (251) 441-6241 Removal of 5,000 square feet of existing modified bitumen roofing system, and installation of new hot mopped modified roofing system with […]

Repair Waterfront SARDET Bulkhead at Coast Guard Station Dauphin Island, Alabama

US Coast Guard Civil Engineering Unit Miami (Prime Contractor) Contract No: HSCG82-10-D-PMVA36 / Task Order No: HSCG82-14-J-PMV110 Contract Amount: $78,500.00 Performance Period: 90 Days (5/5/2014 – 8/5/2014) Ongoing POC: Gustavo Vergara, Contract Specialist, 305-278-6723 Work involves replace broken and deteriorated cross bracing, horizontal fender members, broken deck members, perform concrete spall repairs, rout and seal […]

Repair Roof Hanger 1 at Aviation Training Center Mobile, Alabama

US Coast Guard Civil Engineering Unit Miami (Prime Contractor) Contract No: HSCG82-10-D-PMVA36 / Task Order No: HSCG82-14-J-PAT008 Contract Amount: $399,019.44 Performance Period: 120 Days (02/3/2014 – 06/3/2014) Ongoing POC: Gustavo Vergara, Contract Specialist, 305-278-6723 Remove modified bitumen roofing and install 65,000 square feet of liquid applied cool roofing (Hydro-Stop) on active flight line for Hanger […]

Gulf Strike Team (GST) Hanger/Warehouse Roof Replacement

U.S. Coast Guard Civil Engineering Unit- Miami Contract No: HSCG82-10-D-PMVA36 / Task Order HSCG82-12-J-3AT002 Contract Amount: $412,205.61 Performance Period: 270 Days (2/20/2012 – 11/22/2012) POC: Rabon Lewis, Contracting Officer, CEU Miami, 305-278-6731 Remove existing aluminum metal roofing system from GST Hanger and Warehouse. Replace approximately 50,000 square feet of roof with seamless metal roofing, gutters […]

Emergency Sewer Repairs

US Coast Guard Sector Mobile, Alabama Contract No: HSCG29-11-P-PmW049 Contract Amount: $23,862.00 Performance Period: 3 Days (1/14/2011 – 1/17/2011) POC: Jerry Willhite, USCG Sector Mobile (321)853-7176 Remove damaged existing 6″ cast iron sewer main piping. Install new 6″ PVC sewer main under vessel wharf and to the existing lift station. Pressure test and turn over […]

Dredge Vessel Moorings & Boat Basin

US Coast Guard Sector Mobile, Alabama Contract No: HSCG82-10-C-PMVA69 Contract Amount: $1,059,174.00 Performance Period: 120 Days (10/18/2010 – 2/16/2011) POC: Ada Hoggard, USCG CEU Miami, (305) 278-6724 Perform pre-hydrographic survey of planned dredge areas, perform mechanical dredging of approximately 9,000 cubic yards of material, mix iwth 10% fly ash, perform dredge material sampling/testing and transport […]

Demolish Cottages

demolish cottages

US Coast Guard Recreational Facility Dauphin Island, Alabama Contract No: HSCG83-10-C-703001 Contract Amount: $632,274.00 Performance Period: 180 Days (2/5/2010 – 8/5/2010) POC: Teresa Calabrese, USCG Civil Engineering Unit – Providence Demolish fourteen (14) recreational cottages, removal of utilities, electrical, water main, sewage lines, lift station, removal of existing foundation timber piles, driveways, parking areas, removal […]

Construct Concrete Breakwater

USCG Station Dauphin Island, Alabama Contract No: HSCG82-07-C-3WCA22 Contract Amount: $562,929.27 Performance Period: 150 Days (6/25/2007 – 11/22/2007) POC: Odalys McGee, USCG Civil Engineering Unit – Miami Demolition of existing failed concrete breakwater, to include the demolition of concrete sheet piling, concrete batter pilings, timber dock, timber piles and timber fenders. Installation of new concrete […]