Tag Archives: Coast Guard Projects

Emergency Sewer Repairs

US Coast Guard Sector Mobile, Alabama Contract No: HSCG29-11-P-PmW049 Contract Amount: $23,862.00 Performance Period: 3 Days (1/14/2011 – 1/17/2011) POC: Jerry Willhite, USCG Sector Mobile (321)853-7176 Remove damaged existing 6″ cast iron sewer main piping. Install new 6″ PVC sewer main under vessel wharf and to the existing lift station. Pressure test and turn over […]

Homeporting Fast Response Cutters (FRC)

US Coast Guard Base Support Unit Miami Beach, Florida Contract No: DTCG47-02-D-3EFK11, Task Order No: HSCG47-10-J-A11054 Contract Amount: $1,282,282.00 Performance Period: 270 Days (11/26/2010 – 7/26/2011) POC: Jay Graven, Tesoro Tetra Tech (757) 518-8491 Remove and replace existing Coast Guard cutter mooring bollards, foam filled fenders, concrete pavements, concrete pile caps, and mooring cleats. Install […]

Dredge Vessel Moorings & Boat Basin

US Coast Guard Sector Mobile, Alabama Contract No: HSCG82-10-C-PMVA69 Contract Amount: $1,059,174.00 Performance Period: 120 Days (10/18/2010 – 2/16/2011) POC: Ada Hoggard, USCG CEU Miami, (305) 278-6724 Perform pre-hydrographic survey of planned dredge areas, perform mechanical dredging of approximately 9,000 cubic yards of material, mix iwth 10% fly ash, perform dredge material sampling/testing and transport […]

Fixed Wing Hanger & Wash Rack Replacement

U.S. Coast Guard Air Station Opa Locka, Florida Contract No: HSCG82-10-C-PACP19 Contract Amount: $2,433,077.00 Performance Period: 390 Days (8/30/2010 – 9/30/2011) POC: Ada Hoggard, Contracting Officer, 305-278-6724 Structural repairs to aircraft hanger, construct new secure communications center (SIPRNET), remove existing airfield paint markings, demolish existing overhead aircraft wash rack, construct and install new in-ground aircraft […]

Waste Water Treatment Plant & Drainfield

Coast Guard Station Atlantic Beach, North Carolina Contract No: HSCG83-10-C-PCU058 Contract Amount: $1,011,654.99 Performance Period: 175 Days (5/1/2010 – 10/30/2010) POC: Pamela Komer, USCG CEU Cleveland, (216) 902-6216 Construct new waste water treatment plant (WWTP) and drainfield to replace failing plant. Demolish and dispose of existing waste water treatment plant, site grading, seeding, electrical upgrades. […]

Demolish Cottages

demolish cottages

US Coast Guard Recreational Facility Dauphin Island, Alabama Contract No: HSCG83-10-C-703001 Contract Amount: $632,274.00 Performance Period: 180 Days (2/5/2010 – 8/5/2010) POC: Teresa Calabrese, USCG Civil Engineering Unit – Providence Demolish fourteen (14) recreational cottages, removal of utilities, electrical, water main, sewage lines, lift station, removal of existing foundation timber piles, driveways, parking areas, removal […]

Divesture of Primary Power Systems

divesture-primary-power-10

US Coast Guard Base Support Unit Miami Beach, Florida Contract No: HSCG82-10-C-PMVA03 Contract Amount: $533,857.00 Performance Period: 150 Days (2/1/2010 – 7/1/2010) POC: Sherry Dague, USCG Civil Engineering Unit – Miami Replace Coast Guard owned 4.16kV primary power system with a utility owned 13.2kV primary power distribution system. Work included saw cutting of existing pavements, […]

Miscellaneous Project Repairs

air station construction and repairs

US Coast Guard Air Station New Orleans, Louisiana Contract No: HSCG82-10-C-PMVA07 Contract Amount: $672,175.00 Performance Period: 180 Days (1/25/2010 – 9/30/2010) POC: Lesia Moyer, USCG Civil Engineering Unit – Miami Remove existing ceilings and components, remove and replace existing air conditioning systems including air handling units, condensing units, associated piping, controls and ductwork. Preparation of […]

Construct Floating Dock

US Coast Guard Integrated Support Command Miami Contract No: HSCG82-09-C-3WCA50 Contract Amount: $350,025.00 Performance Period: 120 Days (10/5/2009 – 2/5/2010) POC: Sherry Dague, USCG Civil Engineering Unit – Miami Remove 87’ existing coast guard pier. Drive in place six (6) new concrete pilings (14”x14”x40’), install new 80’ floating dock, install 36’ floating dock extension, install […]

Hurricane Ike Emergency Waterfront Structural Evaluations

USCG Sector Galveston, Texas Contract No: HSCG82-08-N-3WC281 Contract Amount: $58,702.00 Performance Period: 14 Days (9/22/2008 – 10/3/2008) POC: Odalys McGee, USCG Civil Engineering Unit – Miami Emergency requirement for underwater evaluations of remaining structures in wake of Hurricane Ike. Perform side scan sonar evaluations to determine debris field. Dive team performed underwater survey to determine […]