Design & Build Storm Sewer Systems, Mobile AL

Inland was awarded a design and build contract to remove and upgrade existing storm sewer systems for the US Coast Guard Civil Engineering Unit at Sector Mobile, Alabama. Design/Build Storm Drainage Systems Coast Guard Sector Mobile, Alabama US Coast Guard Civil Engineering Unit Miami (Prime Contractor) Contract No: HSCG82-10-D-PMVA36 / Task Order No: HSCG82-15-J-PMV169 Contract […]

Offshore Repairs to Aids to Navigation (ATON) Structures

US Coast Guard Civil Engineering Unit – Miami Contract No: HSCG82-12-J-PMV359 Contract Amount: $524,649.82 Performance Period: 165 Days (12/17/2012 – 6/21/2013) POC: Sandra Thibodeau, Contracting Officer, (305) 278-6731 Rehabilitate five offshore range structures in St. Joesph Bay, Florida. Fabricate new lattice range towers (5), mobilize to site, fabricate new range tower mounting base plates, install […]

Gulf Strike Team (GST) Hanger/Warehouse Roof Replacement

U.S. Coast Guard Civil Engineering Unit- Miami Contract No: HSCG82-10-D-PMVA36 / Task Order HSCG82-12-J-3AT002 Contract Amount: $412,205.61 Performance Period: 270 Days (2/20/2012 – 11/22/2012) POC: Rabon Lewis, Contracting Officer, CEU Miami, 305-278-6731 Remove existing aluminum metal roofing system from GST Hanger and Warehouse. Replace approximately 50,000 square feet of roof with seamless metal roofing, gutters […]

North/South Pier Power Project at US Coast Guard Station Portsmouth, Virginia

US Coast Guard Civil Engineering Unit – Cleveland Contract No: HSCG83-11-C-PCT236 Contract Amount: $1,692,433.89 Performance Period: 156 Days (10/1/2011 – 6/15/2012) POC: Verona Wolfe, Contracting Officer, USCG CEU Cleveland (216) 902-6265 Remove existing failed power transformers and cabling in duct banks. Install three new transformers, switch gear and run new electrical conduit and cabling at […]

Construct Floating Pier & Boat Ramp

U.S. Coast Guard Station Freeport, Texas Contract No: HSCG82-11-J-PMV140 (Task Order RMACC) Contract Amount: $231,457.00br Performance Period: 120 Days (7/11/2011 – 11/8/2011)br> POC: Lesia Moyer, Contracting Officer, 305-278-6725 Install new 40′ floating concrete pier secured in place with two 14″ x 55′ concrete pilings, install aluminum access gangway to pier, install concrete prestressed pile cap […]

Pascagoula Channel “A” Range Front Light Demolition

US Coast Guard Civil Engineering Unit – Miami Contract No: HSCG82-11-C-PMV147 Contract Amount: $94,106.75 Performance Period: 13 Days (5/25/2011 – 6/8/2011) Completed 6/6/2011 POC: Odalys McGee, Contracting Officer, USCG CEU Miami (305) 278-6727 Mobilize marine barge and 250 ton crane to Greenwood Island, Mississippi and demolish existing steel pipe navigational range light “A” and haul […]