Tag Archives: Air Force Projects

Design & Build Roof Replacement Building 827, US Air Force

Inland was awarded a design and build roof replacement project for the US Air Force at Little Rock Air Force Base, Arkansas. Design/Build Roof Replacement Building 827 US Air Force Little Rock AFB, Arkansas Department of the Air Force, 19th Contracting Squadron (Prime Contractor) Contract No: FA4460-15-C-0010 Contract Amount: $822,516.36 Performance Period: 210 Days (9/23/2015 […]

Roof Replacement Buildings 729 & 744 for US Air Force

Inland was awarded a roof replacement project of the US Air Force at Dobbins Air Reserve Base, Georgia. Roof Replacement Buildings 729 & 744 US Air Force Dobbins ARB, Georgia Department of the Air Force, 94 CONF/LGC (Prime Contractor) Contract No: FA6703-15-C-0008 Contract Amount: $1,045,611.67 Performance Period: 180 Days (9/21/2015 – 3/20/2016) POC: MAJ Benjamin […]

Replace Timber Piling Dolphin Clusters – Hurlburt Field Air Force Base, Florida

Department of the Navy / American Contractor & Technology, Inc. (Subcontractor) Contract No: N69450-13-C-6080 Subcontract No: 13-202-01 Contract Amount: $65,000 Performance Period: 15 Days (9/30/2013 – 10/14/2013) POC: Teresa Gelormini, Project Manager, (850) 932-9775 Demolish and replace timber piling clusters at the Fuel Dock Facility for Hurlburt Field Air Force Base. Work includes installation of […]

Remove & Replace Bridge Fender System – Manatee County, Florida

Florida Department of Transportation District 1 – Sarasota Operations (Prime Contractor) Contract No: E1L10 Contract Amount: $1,963,030 Performance Period: 365 Days (3/22/2013 – 3/20/2014) POC: Ella Rice, Contract Specialist, FDOT District 1, (863) 519-2567 Improvements consist of bridge repairs to include removal and replacement of bridge fender system, clearance gauges and navigational lighting on SR93 […]

Replace Timber Piling Dolphin Clusters – Tyndall Air Force Base, Florida

Department of the Navy / American Contractor & Technology, Inc. Contract No: N69450-13-C-6072/12-182-01 Contract Amount: $34,974.88 Performance Period: 30 Days (2/1/2013 – 3/4/2013) POC: Teresa Gelormini, Project Manager, (850) 932-9775 Demolish and replace timber piling clusters at the Fuel Dock Facility for Tyndall Air Force Base. Work includes installation of new timber pilings cluster hardware […]

Roof Building 464 Offutt Air Force Base, Nebraska

Department of the Air Force, 55th Contracting Squadron Contract No: FA4600-10-C-0013 Contract Amount: $335,622.00 Performance Period: 180 Days (4/15/2011 – 6/4/2011) POC: David Neal, Contract Specialist (402) 232-8659 Remove existing roof next to active flight line. Install new roof trusses, insulation and Thermoplastic Membrane Roofing (TPO). Work completed four months ahead of schedule.

Construct Building 531

Tyndall Air Force Base, Florida Contract No: 809679 Contract Amount: $191,688.00 Performance Period: 60 days (8/15/2007 – 10/15/2007) POC: Rocky Lorenz, CH2M Hill Constructors, Inc., Construct new masonry block building for the Air Force. Poured in place slab on grade, place CMU walls, install roof trusses, roof decking, pour in place insulation in block walls, […]

Storm Drainage Improvements

Hurlburt Field Air Force Base, Florida Contract No. 808106 Contract Amount: $828,634.37 Performance Period: 120 days (1/18/07 – 5/25/07) POC: Scott Dunbar, CH2M Hill Constructors, Inc. Remove existing storm drainage reinforced concrete pipe, install new 60” & 48” reinforced concrete pipe, concrete headwall, new concrete inlets, saddle inlets, curb inlets with manholes, breakout and remove […]

Culvert Repairs 1, 3, & 4

Eglin AFB/Santa Rosa Range Complex, Florida Contract No. RMS-02-C-0006 (804639) Contract Amount: $1,499,000.00 Performance Period: 120 days (12/19/2005 – 4/23/2006) POC: Gary Beasley – CH2M Hill Constructors, Inc. Excavation and embankment fill, construct temporary detour roads around three culvert work areas, pour-in-place three concrete 4’x10’x28’ box culverts, install 1000 LF of steel sheet piles with […]