Design/Build West Ramp Apron & Wash Rack Airfield Pavements Phase II

USCG Support Center Elizabeth City, North Carolina
Contract No: HSCG83-08-C-3WG064
Contract Amount: Design: $126,000.00 Build: $2,224,000.00
Performance Period: 60 Days (9/22/2008 – 11/22/2008)
POC: Pamela Komer, USCG Civil Engineering Unit – Cleveland

Design new concrete apron pavements to replace failed pavements due to soil stabilization issues. Pavements include west ramp concrete apron and wash rack. Construction work to stabilize subgrade, installation of new base materials, pour in place concrete airfield pavements from 7.5” to 11” in depth.