Culvert Repairs 1, 3, & 4

Eglin AFB/Santa Rosa Range Complex, Florida
Contract No. RMS-02-C-0006 (804639)
Contract Amount: $1,499,000.00
Performance Period: 120 days (12/19/2005 – 4/23/2006)
POC: Gary Beasley – CH2M Hill Constructors, Inc.

Excavation and embankment fill, construct temporary detour roads around three culvert work areas, pour-in-place three concrete 4’x10’x28’ box culverts, install 1000 LF of steel sheet piles with concrete pile cap, pour-in-place concrete approach slabs, concrete roadways, shore block and asphalt paving for the US Air Force at Eglin AFB, Florida.