Construct Floating Pier & Boat Ramp

U.S. Coast Guard Station Freeport, Texas
Contract No: HSCG82-11-J-PMV140 (Task Order RMACC)
Contract Amount: $231,457.00<>br Performance Period: 120 Days (7/11/2011 – 11/8/2011)<>br> POC: Lesia Moyer, Contracting Officer, 305-278-6725

Install new 40′ floating concrete pier secured in place with two 14″ x 55′ concrete pilings, install aluminum access gangway to pier, install concrete prestressed pile cap supported by two concrete 14″ x 61′ concrete pilings, install precast concrete boat ramp panels and concrete curb stop. Work performed for Coast Guard Civil Engineering Unit Miami.