Archive | Projects

Roof Replacement US Postal Service

Inland was awarded a roof replacement contract for the US Postal Service to replace existing EPDM and built-up roofing systems on the Main Post Office, and install 35,000 square feet of fully tapered 60 MIL EPDM roofing system.  Project located in Anderson, Indiana.  Project value $481,500.

Charlotte and Lee County Bridge Repairs, Ft Myers, FL

Florida Department of Transportation Contract No: E1O47 Contract Amount: $2,080,080.05 Performance Period: 150 Days (2/24/2016 – 12/13/2016) POC: Meghan Croft Inland was awarded a bridge repair contract for the Florida Department of Transportation District One in Charlotte and Lee County in Florida.  Work includes installation of cathodic protection pile jacket systems, epoxy crack injection, cast-in-place concrete, rip […]

Roof Replacement Haney Vo-Tech Panama City, Florida

Bay County District Schools (Prime Contractor) Contract No: Re-Roof Tom P. Haney Vo-Tech Membrane Roof 15/16 Contract Amount: $1,796,284 Performance Period: 180 Days (12/9/2015 – 6/8/2016) POC: Larry Taylor, Architect, (850) 785-9839 Remove 140,000 square feet of existing membrane roofing system. Replace with 140,000 square feet of 50 MIL PVC roofing system. Additional work includes […]

Design/Build Shipping Channel Range Lights, Matagorda, Texas

US Coast Guard Civil Engineering Unit – Miami (Prime Contractor) Contract No: HSCG82-10-D-PMVA36 / Task Order No. HSCG82-16-J-PMV034 Contract Amount: $786,868 Performance Period: 180 Days (10/29/2015 – 4/28/2016) POC: Ada Hoggard, Contracting Officer, 305-278-6729 Remove and replace existing Aids to Navigation (ATON) structures. Design, fabricate and install two new ATON structures at Matagorda Ship Channel […]

Waterfront Repairs, Savannah GA Refinery

Inland was selected and awarded a contract for Axeon Specialty Products, LLC to perform waterfront repairs to their refinery in Savannah, Georgia. Axeon Specialty Products, LLC (Prime Contractor) Contract Purchase Order No: 4501400739 Contract Amount: $725,000 Performance Period: 270 Days (11/4/2015 – 5/4/2016) POC: Wil Burley, Project Manager (856) 284-6273 Repair steel sheet pile bulkhead […]