Archive | Projects

Hurricane Rita Pavement Repairs

USCG Station Port Aransas, Texas Contract No. HSCGG1-06-C-3WC378 Contract Amount: $140,018.00 Performance Period: 120 days (8/28/06 – 12/7/06) POC: Jerry Fortin, USCG Civil Engineering Unit – Providence Construct new parking lot, remove existing grass, install new base material, install concrete junction boxes, install asphalt for new parking lot, install asphalt pavement overlay on existing parking […]

Hurricane Rita Concrete Repairs

USCG Air Station Houston, Texas Contract No. HSCGG1-06-C-3WC385 Contract Amount: $271,656.00 Performance Period: 150 days (8/14/06 – 1/12/07) POC: Jerry Fortin, USCG Civil Engineering Unit – Providence Breakout and replace failed concrete on airfield apron and taxiway, remove and replace joint sealant, breakout and repair concrete spalls in three trench drains inside of aircraft hanger, […]

ICE Fall Protection System

USCG LORAN Station Boise City, Felt, Oklahoma Contract No. HSCG82-06-C-3WCA44 Contract Amount: $238,116.04 Performance Period: 150 days (7/25/06 – 12/15/06) POC: Sherry Dague, USCG Civil Engineering Unit – Miami Fabricate and install new columns and ICE fall protection grating, concrete poured in place footings and supports, roofing repairs, copper cap, lightning protection certification for walkways […]

Hurricane Rita Breakwater Repairs

USCG Station Galveston, Texas Contract No. HSCG82-06-C-3WCA31 Contract Amount: $763,049.47 Performance Period: 120 days (5/1/06 – 8/29/06) POC: Deborah Boydston, USCG Civil Engineering Unit Miami Remove failed breakwater seawall, remove concrete pile cap and concrete sheet piles, drive new concrete sheet piles, drive new concrete batter piles, pour-in-place new concrete pile cap. Remove and install […]

Hurricane Rita Roofing Repairs

USCG Station Galveston, Texas Contract No. HSCG82-06-C-3WCA22 Contract Amount: $748,654.70 Performance Period: 90 days (4/10/06 – 7/9/06) POC: Deborah Boydston, USCG Civil Engineering Unit Miami Perform roofing repairs to seven station buildings to include removal of asphalt shingles and replace, remove and replace gutters and downspouts, metal flashing, drip edges, soffit and fascia. Install new […]

Hurricane Wilma Repairs

USCG Station Fort Myers Beach, Florida Contract No. HSCG82-06-C-3WCA13 Contract Amount: $324,780.00 Performance Period: 90 days (3/8/06 – 6/3/06) POC: Deborah Boydston, USCG Civil Engineering Unit Miami Repair interior damage from water, mold remediation, remove asphalt shingles and replace, replace windows, parking lot lights, base antenna, and lightning protection systems.

Culvert Repairs 1, 3, & 4

Eglin AFB/Santa Rosa Range Complex, Florida Contract No. RMS-02-C-0006 (804639) Contract Amount: $1,499,000.00 Performance Period: 120 days (12/19/2005 – 4/23/2006) POC: Gary Beasley – CH2M Hill Constructors, Inc. Excavation and embankment fill, construct temporary detour roads around three culvert work areas, pour-in-place three concrete 4’x10’x28’ box culverts, install 1000 LF of steel sheet piles with […]

Construct Pump Shop & Locker Room

USCG Air Station Clearwater, Florida Contract Number: HSCG82-06-C-3WCA01 Contract Amount: $472,360.47 Performance Period: 210 days (11/7/05 – 6/20/06) POC: Odalys McGee, USCG Civil Engineering Unit – Miami Construct new pump shop & locker room. Construction included pour in place concrete slab, underground utilities, CMU block walls, metal purlins, metal roofing, skylights, interior construction, tile, drywall, […]

Replace Grease Traps in Galley

USCG Sector St. Petersburg, Florida HSCG82-05-C-3WCA65 Contract Amount: $144,539.45 Performance Period: 45 Days (10/17/05 – 1/6/06) POC: Billie Jo Cherico – CEU Miami Remove kitchen equipment, cut into concrete flooring, install new piping for grease trap, cap off old lines, pour in place new concrete floor, install new floor tiles, repair sink hole outside of […]

Hurricane Katrina Emergency Demolition

USCG Station Gulfport, Mississippi DTCG82-04-D-3WCA33 Task Order #4 Contract Amount: $507,827.00 Performance Period: 60 days (9/8/05 – 11/3/05) POC: Billie Jo Cherico, USCG Civil Engineering Unit – Miami Emergency demolition of structures, waste, wood pilings in aftermath of hurricane Katrina. Install five office trailers, hook up electrical and mechanical. Demo underground timber pilings