Roof Replacement Main Post Office Atlanta, Georgia

US Postal Service Eastern Facilities Construction CMT (Prime Contractor) Contract No: 360070-14-B-0046 Contract Amount: $1,340,500 Performance Period: 300 Days (6/23/2014 – 4/13/2015) POC: Jeffery Nowling, Contracting Officer (512) 342-1265 Removal of 115,000 square feet of existing built-up roofing system, and installed new cold applied modified ultra-white roofing system with interior roof drains.

Heritage Trail Span Replacements over Kemp Channel, Monroe County, Florida

Florida Department of Environmental Protection/Gulf Group, Inc. (Subcontractor) Contract No: CN157 Contract Amount: $1,643,000 Performance Period: 320 Days (4/14/2015 – 1/14/2016) POC: Kyle Bordelon, Project Manager (850) 785-0592 Demolition of concrete bridge abutments and install new concrete abutments, two 31’ reinforced concrete pedestrian bridges, one 93’ span structural steel pedestrian bridge, new FDOT aluminum hand […]

Roof Replacement at Main Post Office Decatur, Alabama

US Postal Service Northern Facilities Construction CMT (Prime Contractor) Contract No: 089495-14-B-0094 Contract Amount: $500,156.37 Performance Period: 180 Days (2/10/2015 – 8/5/2015) POC: Richard Spreitzer, COTR (502) 741-2218 Removal of 27,500 square feet of existing built-up roof system, and install new 60 MIL PVC roof system with new interior drains.

Sunshine Skyway Bridge Rehabilitation, Tampa, Florida

Inland was awarded a contract by the Florida Department of Transportation to rehabilitate the North & South fishing piers of the Sunshine Skyway Bridge in Tampa, Florida. Work includes cathodic protection pile jacket systems, metalizing, concrete spall repairs and concrete hand railing replacement. Sunshine Skyway Fishing Pier at St. Petersburg, Florida Florida Department of Transportation […]

Roof Replacement Main Supply Office at Coast Guard Air Station Mobile, Alabama

US Coast Guard Civil Engineering Unit Miami (Prime Contractor) Contract No: HSCG82-10-D-PMVA36 / Task Order No: HSCG82-15-R-PMV014 Contract Amount: $391,000 Performance Period: 90 Days (2/9/2015 – 5/10/2015) POC: Jerry Willhite, Construction Manager (251) 441-6241 Removal of 5,000 square feet of existing modified bitumen roofing system, and installation of new hot mopped modified roofing system with […]

Roof Replacement at Main Post Office Savannah, Georgia

Savannah USPS Processing and Distribution Center Contract No: 089495-14-B-0103

US Postal Service Northern Facilities Construction CMT (Prime Contractor) Contract No: 089495-14-B-0103 Contract Amount: $762,000.16 Performance Period: 250 Days (1/29/2015 – 9/19/2015) POC: Richard Russo, Contract Specialist (860) 285-7014 Removal of 65,000 square feet of existing EPDM and built-up roof systems and installation of new 60 MIL PVC roofing system with interior drain systems.

Roof Replacement at Coast Guard Sector New Orleans, Louisiana

HSCG82-10-D-PMVA36 / Task Order No: HSCG82-15-R-PMV043

US Coast Guard Civil Engineering Unit Miami (Prime Contractor) Contract No: HSCG82-10-D-PMVA36 / Task Order No: HSCG82-15-R-PMV043 Contract Amount: $521,900.05 Performance Period: 120 Days (1/9/2015 – 5/27/2015) POC: Carlos Garcia, Contracting Officer (305) 278-6722 Removal of 20,000 square feet of existing modified bitumen roofing system, and installation of torch/hot mopped modified roofing system with new […]

Bridge Repairs Boca Chica, Florida

Florida Department of Transportation (Prime Contractor) Contract No: T6368 Contract Amount: $643,583.66 Performance Period: 180 Days (9/24/2014 – 3/10/2015) POC: Jacki Hart, Project Administrator (954) 775-6949 Install 26 structural cathodic protection pile jackets, expansion joint material, methacrylate concrete bridge deck sealant. Perform topside, underdeck and beam concrete spall repairs with epoxy crack injection and bridge […]

Roof Replacements Main Post Office & Vehicle Maintenance Facility Columbus, Ohio

post-office-construction-008

US Postal Service Eastern Facilities Construction CMT (Prime Contractor) Contract No: 360070-13-B-0039 Contract Amount: $3,356,159.92 Performance Period: 365 Days (8/13/2013 – 8/14/2014) POC: John Sweany, Construction Manager, 330-923-8461 Remove 248,250 square feet of existing Duro-Last PVC single ply roof system and replace with Versico 80 Mil single ply PVC roofing system. Install 220 new roof […]